Blog

Ebbw Vale former Steel Works

Posted by:

Ebbw Vale former Steel Works

JCMES were employed by Walters Ltd to undertake an Environmental Clean within the basement areas of the former steel works.

The works involved the pumping out of asbestos contaminated water, using a specialist pumping system devised by JCMES. The total volume of water cleaned during this project was 86000 gallons!!. Subsequently the areas were cleaned and tested by an independent analayst and passed as clean.

Phase two involvedthe removal of hydrocarbon contaminated sludge and water which was succeffuly undertaken in conjunction with Biffa.

0


About the Author